Camelia Sans - Unique Typeface

$19
+15% off multiple license
  • $19.00
    seat
    seat
    1
  • $19.00 $16.15
  • $29.00 $26.15
  • $152.00 $149.15
The quick brown fox jumps over the lazy dog
Loading Preview

About

Reviews

Most Recent

Comments

FAQs

How do I contact support?

For questions about this product, message the Shop Owner via their shop profile. For all other questions, like licensing or billing, visit our Help Center.

How can I unzip product files?

PC: To extract a single file or folder, double-click the compressed folder to open it. Then, drag the file or folder from the compressed folder to a new location. To extract the entire contents of the compressed folder, right-click the folder, click Extract All, and then follow the instructions.

Mac: Double click the .zip file, then search for the product folder or product file.

If you continue to have trouble, check out this help article for more tips.

How do I install a font?

After you unzip your font product files, you will see .OTF or .TTF files. To install a font, just double click on the OTF or TTF file. For more information, check out our Font FAQ.

If you’re still having trouble installing the font, please contact the Shop Owner or Creative Market Support.

What software do I need to use this font?

When a font is installed on your computer, it can be used with any program that allows you to create text. Fonts will work in Microsoft Office applications, Adobe software, and almost any other program with a text editor. You can learn more in our Help Center about OTF special features and installing your new font.

Note: As an exception, OpenType SVG fonts / color fonts require Photoshop CC 18.0+, Illustrator CC 22.0.0+, or InDesign CC 13.0.1+. To learn more about installing color fonts, check out this Color Font FAQ.

Product Specs

  • File Size: 1.11 MB
  • Vector
  • Created: Aug 27, 2020

Suggested Searches

based on this product