Project Plan | MS Word & Indesign
About
ITEM SPECIFICATION :
• Available in microsoft word (compatible with 2010 and higher version)
• Available in adobe indesign (compatible with cs4 and higher version)
• A4 size (8.27" x 11.69")
• 3 pages custom document
• Can be used for print or digital files (export to pdf)
• Using paragraph styles & character styles in adobe indesign & microsoft word
• Editable files (text, color, & objects are editable)
• Use free fonts (download link in file guide .pdf)
• Provide file guide (please read this before open the file)
• Layered files
FILE INCLUDED :
• Microsoft word document file (.docx)
• Adobe indesign CC 2020 document (.indd)
• Adobe indesign (.idml) for cs4 or later version
• File guide .pdf
• Font download link
IMPORTANT NOTES :
• This document is editable in microsoft word & adobe indesign only. It will not work in pages, google docs, adobe photoshop or other program. Please make sure you have the proper software before editing this item.
• This is a template file, not a product mockup.
• Please open & read the file guide pdf first before open the file (read about file guide in section below).
• The text in preview image are sample text or placeholder text. You can insert your content or text.
FILE GUIDE :
This item is include file guide in pdf format (34 pages) . This file guide has images & text for help you to use or edit the file.
• Microsoft word
◦ How to edit the text box ◦ How to change the text color ◦ How to change the shape color ◦ How to change font using character styles ◦ How to duplicate pages or create new pages ◦ How to delete pages ◦ How to duplicate and add new row in table ◦ How to delete row in table ◦ How to insert your logo to the template
• Adobe indesign
◦ How to change the color ◦ How to change font using character styles ◦ How to duplicate pages or create new pages ◦ How to delete pages ◦ How to duplicate and add new row in table ◦ How to delete row in table
Thank you :)
Reviews
No reviews yet
Comments
FAQs
- How do I contact support?
For questions about this product, message the Shop Owner via their shop profile. For all other questions, like licensing or billing, visit our Help Center.
- How can I unzip product files?
PC: To extract a single file or folder, double-click the compressed folder to open it. Then, drag the file or folder from the compressed folder to a new location. To extract the entire contents of the compressed folder, right-click the folder, click Extract All, and then follow the instructions.
Mac: Double click the .zip file, then search for the product folder or product file.
If you continue to have trouble, check out this help article for more tips.
Similar Templates & Themes
-
$15 $13.50