Beverage Care Bundle – Mug & Tumbler
About
Beverage Care Bundle – Mug & Tumbler Care Cards
25 Digital Files | Print-Ready Care Instructions | Small Business Friendly
Provide your customers with clear, professional care instructions using this Beverage Care Bundle, created for mug and tumbler makers, handmade sellers, and small businesses. This digital bundle includes both Mug Care and Tumbler Care designs, formatted for easy printing and professional packaging inserts.
All files are digital only, print-ready, and delivered via a zipped Google Drive download.
✨ What’s Included
Mug Care Set — 8 Files Total •4 Pattern / Design Styles File breakdown: •4 PDF files (print-ready) •2 PNG files (300 DPI; transparent background when applicable) •2 SVG files (cut-friendly / scalable)
📐 Size: Business Card (3 x 2.5 inches) - Perfect for mug packaging, order inserts, and small business branding.
Tumbler Care Set — 17 Files Total •5 Pattern / Design Styles File breakdown: •8 PDF files (print-ready) •5 PNG files (300 DPI; transparent background when applicable) •2 SVG files (cut-friendly / scalable) •2 JPEG files (print-friendly)
Sized for care cards and packaging inserts, making them ideal for tumbler orders and drinkware packaging.
📁 File Details
•Total Files: 25 •Formats Included: PDF, PNG, SVG, JPEG •Resolution: PNG files are 300 DPI
Backgrounds: Some PNG files include a transparent background. Some PNG files include a background depending on the design style
Print-Ready: Yes Delivery: Zipped file via Google Drive
Product Type: Digital download only (no physical product)
Perfect For: •Mug & tumbler makers •Handmade sellers & small businesses •Packaging inserts & care cards •Print-at-home or professional printing •Cricut, Silhouette, and other cutting machines (SVG files)
📌 Important Notes This is a digital product. No physical item will be shipped. Colors may vary slightly depending on screen and printer settings.
Not every design includes every file type; total file counts are listed above.
🔒 Licensing This product is sold under the Creative Market Standard License. Your purchase grants you the right to use these files for personal or small business use on physical end products, such as printed care cards or packaging inserts.
You may not resell, share, gift, or redistribute the digital files themselves in any format.
Reviews
No reviews yet
Comments
FAQs
- How do I contact support?
For questions about this product, message the Shop Owner via their shop profile. For all other questions, like licensing or billing, visit our Help Center.
- How can I unzip product files?
PC: To extract a single file or folder, double-click the compressed folder to open it. Then, drag the file or folder from the compressed folder to a new location. To extract the entire contents of the compressed folder, right-click the folder, click Extract All, and then follow the instructions.
Mac: Double click the .zip file, then search for the product folder or product file.
If you continue to have trouble, check out this help article for more tips.
Similar Graphics
-
-
$23 $20.70