Designed by Anna Ivanova Owner of WBS Design 5.0 out of 5 stars (5) 862 sales
Vintage Factory Graphic Set
About
Old factory graphic set contains 27 elements for making design in an industrial style. All graphics are hand drawn with coloured pencils - this is a good alternative to watercolor, it looks freshly and texturally. Pencils drawn graphic is easily combined with a real backgrounds such as concrete, plaster, wood, canvas or brick.
You can use these elements for making scrapbooking paper, cards, branding and more in an industrial, retro or vintage style. Elements are carefully cut out on isolated PNG and also conveniently groupped in one PSD file.
In archive you will find:
- 27 transparent PNG files with isolated elements (smallest element size is 480x505 px, biggest - 4600x6842 px)
- 1 PSD file with isolated elements on different layers (layers are hidden to reduce file size)
Have a nice day!
Reviews
No reviews yet
Comments
FAQs
- How do I contact support?
For questions about this product, message the Shop Owner via their shop profile. For all other questions, like licensing or billing, visit our Help Center.
- How can I unzip product files?
PC: To extract a single file or folder, double-click the compressed folder to open it. Then, drag the file or folder from the compressed folder to a new location. To extract the entire contents of the compressed folder, right-click the folder, click Extract All, and then follow the instructions.
Mac: Double click the .zip file, then search for the product folder or product file.
If you continue to have trouble, check out this help article for more tips.