Designed by Munni Akter Owner of design_hut 1.0 out of 5 stars (1) 58 sales
Project Plan | MS Word & Indesign
About
Proposal | MS Word, Indesign,
Proposal Template that is super simple to edit and customize with your own details! Simply add your own images and text, I hope you like it. Fully documented file for InDesign, and Word file.
Available for Software:
- Adobe InDesign CS6
- Microsoft Word 2016
File Included:
- InDesign CS6 INDD file ( Compatible with Cs4,Cs5,Cs6,CC, CC 2015, CC 2016- 24 ).
- InDesign CS4 or later (IDML) file )
- Microsoft Word 2016 ( docx file )
- 1 PDF file
Proposal Template
- A4 Size Page
- 03 custom page
- Multipurpose
- Simple and Minimal Layout
- Clean Layout
- Size: 8.27x11.69 in
- 6 / 12 Content Column Grid
- Easy Change Photo with Smart Object
- Everything you see can be edited
- Print ready
- Color: CMYK
- Resolution: 300 Dpi
- Bleed : 5 mm
- Images are not included file
- Only Free Fonts Used, download link attached in help file
Font Used:
Font used on the Proposal Template : open-sans, Montserrat, source sans pro
- http://www.fontsquirrel.com/fonts/open-sans
- https://www.fontsquirrel.com/fonts/montserrat
- https://www.1001fonts.com/source-sans-pro-font.html
Support:
If you need any help using the file or need special customizing please feel free to contact me via my profile. If you have a moment, please rate this item, I will appreciate it very much! If you like this, Please .Thank you.2
Reviews
No reviews yet
Comments
FAQs
- How do I contact support?
For questions about this product, message the Shop Owner via their shop profile. For all other questions, like licensing or billing, visit our Help Center.
- How can I unzip product files?
PC: To extract a single file or folder, double-click the compressed folder to open it. Then, drag the file or folder from the compressed folder to a new location. To extract the entire contents of the compressed folder, right-click the folder, click Extract All, and then follow the instructions.
Mac: Double click the .zip file, then search for the product folder or product file.
If you continue to have trouble, check out this help article for more tips.
Similar Templates & Themes
-
$12 $10.80
-
$18 $13.50
-
$15 $10.50