Project Plan | Word, Indesign, Canva

$14
  • $9.00
  • $14.00
    seat
    seat
    1
  • $36.00

About

Reviews

No reviews yet

Comments

FAQs

How do I contact support?

For questions about this product, message the Shop Owner via their shop profile. For all other questions, like licensing or billing, visit our Help Center.

How can I unzip product files?

PC: To extract a single file or folder, double-click the compressed folder to open it. Then, drag the file or folder from the compressed folder to a new location. To extract the entire contents of the compressed folder, right-click the folder, click Extract All, and then follow the instructions.

Mac: Double click the .zip file, then search for the product folder or product file.

If you continue to have trouble, check out this help article for more tips.

Product Specs

  • Compatible with: Adobe InDesign, Powerpoint, Word, Other
  • File Size: 1.6 MB
  • Vector
  • Dimensions: 8.27 x 11.69 in
  • DPI: 300
  • Created: Dec 10, 2023
Preview the Files

Suggested Searches

based on this product