Bluewaves
About
Bluewave is a lightweight, feature-rich and easy to use admin template based on Bootstrap v3.2.0.
Features:
- Bootstrap v3.2.0
- Fully Responsive
- Fixed Top Navigation
- Graphs (Chart, Flot, Sparkline)
- Todos
- Media Gallery (image and video)
- Profile Page
- Invoice
- Vector Maps
- Blank Page
- 404 Error
- Login
- UI Elements
- Pagination
- Progress Bars
- Labels & Badges
- Alerts
- Heading
- Tooltips
- Popovers
- Modal
- Buttons with color and size variation
- Label Buttons
- Drop Down buttons
- Button Groups (horizontal & vertical)
- Block Buttons
- Sliders
- grids
- Icons
- Tabs & Accordions
- Calendar
- WYSIWYG Editor
- Invoice
- Tables
- Data Table
- Basic Form Elements
- Basic Form validation
- Horizontal Form
Reviews
No reviews yet
Comments
FAQs
- How do I contact support?
For questions about this product, message the Shop Owner via their shop profile. For all other questions, like licensing or billing, visit our Help Center.
- How can I unzip product files?
PC: To extract a single file or folder, double-click the compressed folder to open it. Then, drag the file or folder from the compressed folder to a new location. To extract the entire contents of the compressed folder, right-click the folder, click Extract All, and then follow the instructions.
Mac: Double click the .zip file, then search for the product folder or product file.
If you continue to have trouble, check out this help article for more tips.