Architect Interior Design WordPress
About
Handcrafted for Architects, Engineering and Construction companies A lightweight WordPress theme which uses a powerful and user-friendly framework to create corporate sites. This style is best suited for the websites of architectural firms, designers and freelance architects. Mainly, its framed layout is just impressive to showcase your designs. As no coding or advanced programming knowledge is required, with only one click, you can import the demo content and publish your content in a few minutes. The portfolio options are amazing to promote your projects and, moreover, you are able to create your personal online store with WooCommerce if you need to commercialize your services.
Features List
- Boxed, Stretched and Framed Layout
- Multiple Headers which you can easily build on your own!!
- Hidden Side Navigation
- One-Click Dummy Data
- Amazing Demo on Demand to get specific content
- Amazing Feature Section (custom/full height with color, image, slider, video or map)
- Smooth Parallax Scroll Effect
- Usage of 3 different Headers (Default, Light, Dark)
- Different styles for your Sticky Header (Advanced, Simple, Shrink)
- Extra Sticky Anchor Menu per Page
- One Page Version
- Backgrounds Sections (Color, Image, Video)
- Backgrounds Sections Effects (Parallax, Animated, Default)
- Transparent Menus
- Mega Menus
- Multiple Custom Page Titles
- Live Color Customizer with Unlimited Color Options
- Extensive Typography Options
- Ultra Responsive Design
- Retina Ready
- Smooth Scroll
- Innovative Option Panel based on Redux Framework
- Visual Composer by WPBakery (value $33)
- Revolution Slider (value $18)
- Predefined Color Presets
- Crossbrowser Compatible
- CSS animations
- Full Width Background Sections
- Full Width Elements
- Unlimited Sidebars
- Fixed Sidebars
- Top Bar Header Elements
Reviews
No reviews yet
Comments
FAQs
- How do I contact support?
For questions about this product, message the Shop Owner via their shop profile. For all other questions, like licensing or billing, visit our Help Center.
- How can I unzip product files?
PC: To extract a single file or folder, double-click the compressed folder to open it. Then, drag the file or folder from the compressed folder to a new location. To extract the entire contents of the compressed folder, right-click the folder, click Extract All, and then follow the instructions.
Mac: Double click the .zip file, then search for the product folder or product file.
If you continue to have trouble, check out this help article for more tips.
- Can I install this theme on my WordPress.com hosted site?
If you have a Wordpress.com business plan, you can install this theme on Wordpress.com. Otherwise, this theme can only be installed on your own self-hosted WordPress site.
Suggested Searches
based on this productSimilar Templates & Themes
-
$89 $62.30