Designed by uinstrument indisains Owner of UInstrument 143 sales
Kids Toys Store WooCommerce WP Theme
About
Beautiful, modern, and responsive Kids Toys Store WooCommerce Theme. A perfect fit for any kids toys and games, action toys, pre-school toys, educational toys. Additionally, it is perfect for kids fashion, baby clothing, mom and baby, infant store, toddlers clothing….
Beside a large number of features, this theme is a perfect template for leaving a positive impression to your customers. This theme support you many great tools to enable the features via using Theme Options, you also can customize Google fonts without code very easy and simple.
Finally, every single element of in this template is entirely responsive, as content can be viewed from desktop and mobile devices.
All Features
- WordPress 6+ Ready
- WooCommerce 8+ Ready
- Elementor
- Online Documentation
- 03+ different homepage styles
- RTL Support
- Sticky menu
- Unlimited Different 03 Headers & 02 Footers (Footer Builder, building footer your way)
- Homepage sliders (Revolution Slider powered)
- Blog template – 04 styles (Grid, List)
- Unlimited Colors (Customize fonts, colors, backgrounds)
- Typography control (System fonts and Google fonts)
- Built with Bootstrap
- Responsive design (Mobile, Tablet and Desktops supported)
- SEO Optimized
- Translation Ready with a .pot file or WPML
- Megamenu, Multi level dropdown menu
- Demo content available(one click import)
- 07+ Product Detail layout
- 07+ Shop Layout
- Product Ajax: Add To Cart, Wishlist
- Product Compare
- Product Quickview
- Corlor Attributes Swatches
- Shop Grid View and List View supported
- Live search, Autocomplete search
- Social Sharing Features
- Easy To Customize
- Validate HTML5 Code
Image, Graphics Credits Images, graphics, and illustrations are taken from some free and online resources. We used images only for preview/ demo purposes. Images will be loaded with your demos when you import them. But you are supposed to replace them with your own.
Reviews
No reviews yet
Comments
FAQs
- How do I contact support?
For questions about this product, message the Shop Owner via their shop profile. For all other questions, like licensing or billing, visit our Help Center.
- How can I unzip product files?
PC: To extract a single file or folder, double-click the compressed folder to open it. Then, drag the file or folder from the compressed folder to a new location. To extract the entire contents of the compressed folder, right-click the folder, click Extract All, and then follow the instructions.
Mac: Double click the .zip file, then search for the product folder or product file.
If you continue to have trouble, check out this help article for more tips.
- Can I install this theme on my WordPress.com hosted site?
If you have a Wordpress.com business plan, you can install this theme on Wordpress.com. Otherwise, this theme can only be installed on your own self-hosted WordPress site.