Christmas Editable Outline Icon Pack
About
🎄 Christmas Editable Outline Icons
Create beautiful Christmas-themed designs with this set of 33 editable outline icons. Perfect for holiday branding, greeting cards, packaging, social media, websites, mobile apps, presentations, stickers, Cricut projects, laser cutting, print-on-demand products, and much more.
Includes both SVG (Editable Stroke) files for professional vector editing and SVG (Canva Ready) files with separate shapes for effortless editing and recoloring.
✨ What's Included
✅ AI Adobe Illustrator file (33 Editable Outline Icons)
✅ EPS Vector File (33 Editable Outline Icons)
✅ 33 SVG Files (Canva Ready)
✅ 33 SVG Files (Editable Stroke)
✅ 33 Individual Transparent PNG Files
✅ README.txt (Quick Guide)
⭐ Features
• Editable Stroke
• Canva Ready SVG Files
• Separate Shapes for Easy Editing
• Easy to Recolor
• Pixel Perfect
• Transparent Background
• Infinite Vector Scaling
• High-Resolution PNG Files
• Clean & Organized Layers
• Ready for Personal & Commercial Projects
💡 Perfect For
• Greeting Cards
• Christmas Invitations
• Gift Tags
• Stickers
• Packaging
• Apparel & T-Shirts
• Mugs & Tumblers
• Tote Bags
• Social Media Posts
• Websites & Apps
• Cricut & Silhouette Projects
• Print-on-Demand
• Branding
• Scrapbooking
💻 Compatible With
• Adobe Illustrator
• Affinity Designer
• Figma
• Canva
• Inkscape
• CorelDRAW
• Cricut Design Space
• Silhouette Studio
• Other software supporting AI, EPS, SVG, or PNG files
Please note: Preview mockups and product photos shown in the listing are for presentation purposes only and are not included in the download.
Reviews
No reviews yet
Comments
FAQs
- How do I contact support?
For questions about this product, message the Shop Owner via their shop profile. For all other questions, like licensing or billing, visit our Help Center.
- How can I unzip product files?
PC: To extract a single file or folder, double-click the compressed folder to open it. Then, drag the file or folder from the compressed folder to a new location. To extract the entire contents of the compressed folder, right-click the folder, click Extract All, and then follow the instructions.
Mac: Double click the .zip file, then search for the product folder or product file.
If you continue to have trouble, check out this help article for more tips.
Suggested Searches
based on this productSimilar Graphics
-
$21 $18.90
-
$22
-
$15
-
$21
-
$17